Click here to make tpub.com your Home Page

Page Title: Table 2. STE/ICE-R Go Chain Test - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-1
0017 00
SIMPLIFIED TEST EQUIPMENT FOR INTERNAL COMBUSTION ENGINE--REPROGRAMMABLE
(STE/ICE-R) GO CHAIN TROUBLESHOOTING (Contd)
Table 2. STE/ICE-R Go Chain Test (Contd).
NOTE
Test GO1, VTM Connections and Checkout, must be
performed before running any other STE/ICE-R test.
TK
ENGINE START--LUBRICATION CHECK
G04
MODE
CAUTION
Check oil level before starting engine.
1
CHECK ALL FLUID LEVELS:
WARNING
Check oil level. Add oil if necessary.
Do not remove radiator cap when engine
Remove radiator cap and check coolant level.
is hot. Wait until engine cools. Failure to
Add coolant if necessary.
Check battery electrolyte level.
Add distilled water if necessary.
CAUTION
Ensure all hydraulic power switches are off.
Disengage manual hydraulic levers if vehicle is
so equipped. Damage could result to vehicle.
2
START ENGINE
Try to start engine.
Does engine crank and start?
YES
NO
Does engine crank?
YES
NO
Turn off master switch.
Proceed to No Crank-No
Start Test, NG 20.
Proceed to Engine Crank-
No Start Test, NG 30.
NG20
NG30
3
CHECK OIL PRESSURE GAUGE
Check oil pressure gauge for minimum oil
pressure noted in the table on page 12 of this WP.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business