|
|
TM 9-2320-209-34-2-3
Vent Operating Test.
c.
FRAME 1
Soldier A 1.
Cover opening in tube (1).
Soldier B 2.
Using soapy water, check that there are no pressure leaks around
connection ( 2). If bubbles appear, tighten clamp screw (3). If
more repair is needed, refer to para 21-21.
END OF TASK
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |