Click here to make tpub.com your Home Page

Page Title: Replacement.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-3
Replacement.
c.
FRAME 1
Working under truck, put on gasket (1).  Lift power takeoff (2) on transmission
1.
(3).
Put on six nuts (4) and washers (5).  Tighten nuts to 30 to 40 pound-feet.
2.
NOTE
Follow-on Maintenance Action Required:
1.
If working on truck M342A2, replace hydraulic
hoist pump propeller shaft and yoke. Refer to
TM 9-2320-209-20.
2.
If working on truck with front winch, replace
front winch propeller shaft and yoke. Refer to
Transmission Power Takeoff Shaft Linkage Removal
and Replacement, TM 9-2320-209-20.
3.
Fill transmission. Refer to LO 9-2320-209-12/1.
If working on truck with front winch, replace front
4.
winch propeller shaft.  Refer to TM 9-2320-209-20.
If working on truck M342A2, replace hydraulic
5.
hoist pump propeller shaft. Refer to
TM 9-2320-209-20.
END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business