|
|
TM 9-2320-209-34-2-3
b.
Replacement.
FRAME
1
Using hoist, raise power divider (1) into position with sprocket (2)
Soldier A
1.
facing toward front of truck.
NOTE
If chain (3) has been taken off, put on chain and master
link after step 3.
Soldier B
2.
Working from above power divider (1), lower chain (3) toward
power divider (1) and hold it.
Soldier A
3.
Put chain (3) on sprocket (2). Align mounting holes on power
divider (1) with mounting holes on mounting b-rackets (4 and 5).
4.
Put in four capscrews and washers (6). Tighten cap screws to
105 to 115 pound-feet.
GO TO FRAME 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |