Click here to make tpub.com your Home Page

Page Title: Replacement. - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-3
FRAME 2
1.
Put hoist control valve lever (1) on control box (2) and trunnion (3).
Put in screw (4) and screw on and tighten locknut (5).
2.
NOTE
Follow-on Maintenance Action Required:
1.
Replace hydraulic pump adapter and spacer. Refer
2.
Replace power takeoff propeller shaft. Refer to
Propeller Shaft and Universal Joint Removal and
Replacement, TM 9-2320-209-20.
3.
Fill hydraulic system.  Refer to LO 9-2320-209-12/1.
Raise dump body and drop braces. Lower dump
4.
body . Refer to TM 9-2320-209-10.
END OF TASK
18-217

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business