|
|
TM 9-2320-209-34-2-3
h.
Replacement.
FRAME 1
Soldier A
1.
Working under truck, hold hoist pump assembly (1) and gasket (2)
in place on valve adapter (3).
Soldier B
2.
Put in six screws (4) and washers (5).
NOTE
Follow-on Maintenance Action Required:
1. Put back power takeoff-to-pump propeller shaft. Refer
to TM 9-2320-209-20.
2. Fill hydraulic reservoir. Refer to LO 9-2320-209-12/1.
END OF TASK
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |