Click here to make tpub.com your Home Page

Page Title: END GATE CONTROL LINKAGE REMOVAL, REPAIR, AND REPLACEMENT (TRUCK M342A2).
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-2
17-67. END GATE CONTROL LINKAGE REMOVAL, REPAIR, AND REPLACEMENT
(TRUCK M342A2).
No special tools required
TOOLS:
None
SUPPLIES:
PERSONNEL:
TW O
Truck parked, engine off, handbrake set.
EQUIPMENT
CONDITION:
a. Preliminary Procedure.  Raise dump body part way and put in safety braces.
Refer to Dump Body Safety Brace Locking and Unlocking, TM 9-2320-209-20.
b.  Removal.
WARNING
Never work under dump body unless safety braces
are properly positioned. If these steps are not
taken personnel can be seriously injured.
FRAME 1
Pull hand control lever (1) forward and down to open position.
1.
Take off nut (2) and back off nut (3) on control rod (4).
2.
Take off clevis locknut (5) and clevis bolt (6) with washer (7).
3.
Take tailgate control clevis (8) off control rod (4).
4.
GO TO FRAME 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business