|
|
TM 9-2320-209-34-2-2
FRAME 3
Put lifting fixture (1) into place and aline screw holes. Put in two
Soldier A 1.
1/2-20 x 5 capscrews (2).
2.
Put on chain hoist (3) as shown.
Soldiers 3.
Using hoist, put gear assembly (4) into place in intermediate
A and B
housing (5).
Soldier A 4.
Put in two capscrews (6) and lockwashers (7).
5.
Take out two 1/2- 20 x 5-inch cap screws (2). Take off lifting
fixture (1).
6.
Replace boring case and gear assembly. Refer to para 17-46.
END OF TASK
17-549
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |