|
|
TM 9-2320-209-34-2-1
c. Inspection and Repair. Refer to TM 9-2815-210-34 for procedure to inspect
and repair oil cooler bypass valve.
d. Replacement.
Put in plunger (1), spring (2), gasket (3), and plug (4).
1.
NOTE
Follow-on Maintenance Action Required:
Close hood and left side panel. Refer to TM 9-2320-209-10.
END OF TASK
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |