Click here to make tpub.com your Home Page

Page Title: Section III. POWER TAKEOFF CONTROLS AND LINKAGE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-4
Section III.
POWER TAKEOFF CONTROLS AND LINKAGE
19-25. TRANSMISSION POWER TAKEOFF SHIFT LINKAGE REMOVAL, REPLACEMENT,
CHECKOUT  AND  ADJUSTMENT.
TOOLS:
Pliers
5/8-inch wrench
3/4-inch wrench
SUPPLIES:
None
PERSONNEL:
One
EQUIPMENT
CONDITION:
Truck parked, engine off, handbrake set.
a. Preliminary Procedure.
Remove air hydraulic shield. Refer to Part 2, para
13-14.
Removal.
b.
FRAME 1
1.
Pull and turn poppet (1) on yoke end (2) of clevis (3).
2.
Take off yoke end (2) from transmission power takeoff shifter shaft (4).
3.
Using 5/8-inch wrench, unscrew and take out two screws and lockwashers (5),
holding power takeoff shifting lever support (6) to master cylinder (7).
4.
Take off transmission power takeoff shift linkage.
END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business