|
|
TM 9-2320-209-20-3-4
15/16-inch wrench
TOOLS: 1/2-inch wrench (2)
Breaker bar
15/16-inch socket
Prybar
6-inch ruler
Drill
6-inch extension
SUPPLIES: None
PERSONNEL: One
EQUIPMENT Condition: Truck parked, engine off, handbrake set.
a. Preliminary Procedure. Pull both gin poles away from truck. Refer to TM
9-230-209-10.
b. Adjustment.
FRAME 1
1.
Using 1/2-inch wrenches, unscrew and take out four screws (1) and nuts (2).
2.
Take off floor plate (3).
3.
Using 15/16-inch wrench, breaker bar, and 15/16-inch socket, loosen six
screws (4) and nuts (5).
GO TO FRAME 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |