|
|
TM 9-2320-209-20-3-2
FRAME AND TOWING ATTACHMENTS
GROUP MAINTENANCE
Section I. SCOPE
procedures for the pintle and towing attachments, spare wheel carrier, and fifth
wheel assembly for which there are authorized corrective maintenance tasks at the
organizational maintenance level.
maintenance is authorized at the organizational maintenance level are covered in this
chapter.
Section II. PINTLE AND TOWING ATTACHMENTS
TOOLS: 3/4-inch wrench or 3/4-inch socket ratchet wrench (2)
15/16-inch wrench (2) or 15/16-inch socket ratchet wrench (2)
SUPPLIES: None
PERSONNEL: One
EQUIPMENT CONDITION: Truck parked, engine off, handbrake set.
a. Preliminary Procedure. Remove brush guard from trucks without front winch.
Refer to Part 1, para 6-4.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |