Click here to make tpub.com your Home Page

Page Title: TRANSMISSION TRANSFER CONTROLS AND LINKAGE WITH POWER TAKEOFF REMOVAL AND REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-1
NOTE
Be very careful not to move shifting lever (1) from the
position set in frame 4.
1.
Pull shifter shaft (2) out to engage low speed gears. Check that detent action
holds shaft in this position.
2.
Check if holes in yoke (3) aline with hole in shifter shaft (2). If holes do not
aline, adjust length of rod (4) by screwing yoke (3) onto rod (4) to shorten
rod length or unscrewing yoke (3) from rod (4) to make rod longer.
When holes in yoke (3) aline with hole in shifter shaft (2), put in shoulder
3.
bolt (5) as shown.  Screw on locknut (6) and tighten using 3/4-inch wrenches.
GO TO FRAME 6
9-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business