Click here to make tpub.com your Home Page

Page Title: TRANSMISSION TRANSFER CONTROLS AND LINKAGE WITH POWER TAKEOFF REMOVAL AND REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-1
f.  Removal of Transmission Transfer Power Takeoff Shifting Lever Lockout
Linkage (Trucks M49A1C, M49A2C, M50A1, M50A2, and M50A3).
1.
Using needle nose pliers, take cotter pin (1) out of straight headed pin (2) and
take out straight headed pin.
NOTE
Some model trucks have setscrew holding pin in forward
end of control rod (3) instead of cotter pin (4). If so,
unscrew setscrew to take off control rod.
2.
Using needle nose pliers, take cotter pin (4) out of swivel pin (5). Hold con-
trol rod (3) while taking out swivel pin and take off control rod.
Let swivel pin (5) hang on speed control wire (6) until control rod (3) is put
3.
back on truck.
GO TO FRAME 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business