|
|
TM 9-2320-209-20-3-1
ELECTRICAL SYSTEM GROUP MAINTENANCE
Section I. SCOPE
procedures for the charging system, starting system, instrument panel components,
lighting system, sending unit gages and warning buzzers, horn assembly, battery
system, chassis harness, and miscellaneous items for which there are authorized
corrective maintenance tasks at the organizational maintenance level.
maintenance is authorized at the organizational maintenance level are covered in
this chapter.
Section II.
CHARGING
SYSTEM
TOOLS :
9/16-inch open wrench
Mechanical puller
5/8-inch socket wrench (2)
Jumper wire with pins (for
0.005-inch feeler gage
Torque wrench, 150 pound-
Spanner wrench, 3/4 inch to 2 inches
feet capacity
3/4-inch socket wrench
Strap wrench
SUPPLIES : Shim set
Solvent, dry cleaning, type II (SD-2),
Fed. Spec. P-D-680
PERSONNEL:
One
EQUIPMENT CONDITION : Truck parked, engine off, handbrake set.
Preliminary Procedures.
a.
(1) Remove battery ground cable. Refer to para 7-58.
(2) Open hood and both side panels. Refer to TM 9-2320-209-10.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |