|
|
TM 9-2320-209-20-3-1
I
FRAME 2
Using 7/8-inch open end wrench, hold coupling (l). Using 3/4-inch com-
1.
bination box and open end box wrench, screw on and tighten tube nut (2) .
NOTE
The number of clamps (3) may be different on
any tube. Make sure that all clamps are put back.
2.
Put clamp (3) on tube ( 4). Using 7/16-inch open end wrenches, put in and
hold capscrew (5) and screw on and tighten nut (6).
NOTE
Follow-on Maintenance Action Required:
1.
Start engine. Refer to TM 9-2320-209-10.
2.
Check that fuel lines and fittings have no leaks.
3.
Stop engine. Refer to TM 9-2320-209-10.
END OF TASK
TA
087080
4-20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |