Click here to make tpub.com your Home Page

Page Title: Chapter 3. CLUTCH SYSTEM GROUP MAINTENANCE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-1
CLUTCH SYSTEM GROUP MAINTENANCE
Section I. SCOPE
3-1. EQUIPMENT ITEMS COVERED.  This chapter gives equipment maintenance pro-
cedures for the clutch linkage assembly for which there are authorized corrective
maintenance tasks at the organizational maintenance level.
3-2. EQUIPMENT ITEMS NOT COVERED .  All equipment items for which corrective
maintenance is authorized at the organizational maintenance level are covered in this
chapter.
Section II.
CLUTCH
LINKAGE
ASSEMBLY
CLUTCH CONTROL AND LINKAGE REMOVAL , REPAIR, REPLACEMENT,
AND ADJUSTMENT .
TOOLS :  Prybar
6-inch ruler
9/16-inch wrench (2)
Drift pin punch
3/4-inch wrench (2)
Pliers
Flat-tip screwdriver
SUPPLIES :  Chalk, SS-C-266F
PERSONNEL :  One
Truck parked, engine off, handbrake set, wheels
EQUIPMENT CONDITION :
chocked.
Preliminary Procedures.
a.
(1) Take off accelerator linkage. Refer to para 4-29.
(2) On trucks with transmission power takeoff, tell direct support mainte-
nance to take off power takeoff.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business