|
|
TM 9-2320-209-20-2-2
WATER TANK BODY CHECKOUT PROCEDURES
64-1. GENERAL. This chapter gives procedures for checking out the system after
troubleshooting and repair have been done. Procedures are set up in flow chart form
showing the checkout steps in order and referring to the fault symptom index when the
system does not checkout.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |