|
|
TM 9-2320-209-20-1
Table 1-8. Organizational Preventive Maintenance Checks and Services Semiannual Schedule
for M756A2 Pipeline Construction Truck - Cont
Item
Procedures
Item
To Be
Check for and Have Repaired,
No.
Inspected
Replaced, Adjusted as Necessary
6
A-frame assembly
1. Check that boom chains (1), gin poles (2), and
trunnion (3) are not damaged.
2. Put gin poles (2) in rear operating position
and take out trunnion (3). Refer to
TM 9-2320-209-10.
1-52
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |