|
|
TM 9-2320-209-20-1
Table 1-8. Organizational Preventive Maintenance Checks and Services Semiannual Schedule
for M756A2 Pipeline Construction Truck - Cont
Item
Procedures
Item
To Be
Check for and Have Repaired,
No.
Inspected
Replaced, Adjusted as Necessary
5
Tailboard
1. Check that tailboard roller (1) does not bind
roller assembly
by turning it two or three turns.
2. Check that tailboard roller (1) end play
(movement from side to side ) is between
0 and 1/4-inch.
3. Check that clearance between tailboard
roller (1) and support rollers (2) is between
0 and 1/4-inch.
1-51
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |