Click here to make tpub.com your Home Page

Page Title: Table 1-8. Organizational Preventive Maintenance Checks and Services Semiannual Schedule for M756A2 Pipeline Construction Tru...
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-1
Table 1-8. Organizational Preventive Maintenance Checks and Services Semiannual Schedule
for M756A2 Pipeline Construction Truck - Cont
Item
Procedures
Item
To Be
Check for and Have Repaired,
No.
Inspected
Replaced, Adjusted as Necessary
3
Body
1. Check that body subframe (1) is not cracked,
broken, and does not have broken welds. Check
that subframe is alined with truck chassis.
2. Check that mounting sills (2) and floorboards (3)
are not cracked, split, rotten, and do not have
loose or missing hardware.
3. Check that tailgate (4) and body panels (5) are
not bent, broken, and do not have broken welds.
4. Check that hardware for racks and troop seats
(6) is not loose or missing.
1-49

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business