Table 1-1. Organizational Preventive Maintenance Checks and Services Semiannual Schedule - Cont
Item
Procedures
Item
To Be
Check for and Have Repaired,
No.
Inspected
Replaced, Adjusted as Necessary
10
Front axle
(cont)
2. Check that springs (1) and shock absorbers (2) are not loose or damaged.
3. Check that steering knuckle boots (3) are not torn.
11
Air pressure relief
1. Remove air pressure valve from transmission, transfer, front axle, and both rear axles.
valves
Refer to Vol. 3, para 8-3, 9-7 and 12-4.
WARNING
Dry cleaning solvent, SD-2, used to clean parts is
potentially dangerous to personnel and property.
Do not use near open flame or excessive heat. Flash
o
point of solvent is 100 F.
2. Using dry cleaning solvent, clean air pressure relief valves. Dry well using
compressed air.
3. Replace air pressure relief valves. Refer to Vol 3, para 8-3, 9-7, and 12-4.