|
|
TM 3-6665-225-12
Figure 3-21. BA3517/U battery installed in an armored reconnaissance vehicle.
Section II. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
3-5. General
d. "Work time" column. The time required to
a. Purpose. Preventive maintenance checks
perform each procedure is indicated in manhours
(M/H ). Total time required to perform the proce-
and services, table 3-1, are routine procedures for
maintaining equipment in top operating condi-
dures listed for each interval (before, during, and
after operation) is summarized above the column
tion.
headings in table 3-1.
b. "Interval and sequence No." column. Per-
36. Mandatory Component Replacement
form the instructions for each item in the numeri-
cal sequence listed at the appropriate interval.
Intervals
c. "Item to be Inspected-Procedure" column.
1-2) and the M42 alarm unit (fig. 1-5) that must
Follow the instructions listed in this column as
indicated in the "Interval and sequence No."
be replaced periodically by the operator. The
column. Return defective equipment to organi-
replacement intervals are based on periods of
operation.
zational maintenance through your supervisor.
3-20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |