Click here to make tpub.com your Home Page

Page Title: CIRCUIT BREAKER REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-1
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
CIRCUIT BREAKER REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Applicable Models
Equipment Condition
All
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Hood raised and secured (TM 9-2320-361-10).
Battery ground cable disconnected
REMOVAL
NOTE
Vehicle with auxiliary power outlets and personnel heaters
have two additional circuit breakers located next to horn
circuit breaker. Replacement procedures are the same for all
circuit breakers.
Prior to removal, tag all lead wires for installation.
1.
Disconnect wires (1) and (5) from circuit breaker (2).
2.
Remove two screws (4) and circuit breaker (2) from firewall (3).
INSTALLATION
1.
Install circuit breaker (2) on firewall (3) with two screws (4).
2.
Connect wires (1) and (5) to circuit breaker (2).
3.
Connect battery ground cable (WP 0126 00).
4.
Lower and secure hood (TM 9-2320-361-10).
6.
Check operation of horn and personel heater (TM 9-2320-361-10).
7.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
2
1
~
3
5
4
END OF WORK PACKAGE
0115 00-1/2 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business