Quantcast HOSES AND CLAMPS REMOVAL AND REPLACEMENT

 

Click here to make tpub.com your Home Page

Page Title: HOSES AND CLAMPS REMOVAL AND REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
RADIATOR STONE SHIELD REMOVAL AND REPLACEMENT - continued - TM-9-2320-209-20-3-10379
Up
/.5ton/TM-9-2320-209-20-3-1 2-1/2-Ton 6x6 M44A1 and M44A2 Series Trucks (Multifuel) Truck Cargo: M35A1 M35A2 M35A2C M36A2 Manual
Next
HOSES AND CLAMPS REMOVAL AND REPLACEMENT - continued - TM-9-2320-209-20-3-10381
TM 9-2320-209-20-3-1
6-5. HOSES AND CLAMPS REMOVAL AND
REPLACEMENT.
TOOLS :
Flat-tip screwdriver
1/2-inch socket wrench
9/16-inch wrench (2)
10-inch extension
SUPPLIES :
Gasket
PERSONNEL:  One
EQUIPMENT  CONDITION:
Truck parked, engine off, handbrake set.
a.
Cooling System Hoses and Clamps.
(a) Drain cooling system. Refer to para 6-10.
(b) Take off generator belts. Refer to para 6-9.
(2) Removal.
Using screwdriver, loosen two screws (1).
1.
2.
Slide two clamps (2) down on hose (3).
3.
Using 9/16-inch wrenches, unscrew and take off locknut (4).
Pull bolt (5) out of rod end clevis (6).
4.
Pull radiator (7) forward at top, just enough to take off hose (3).
5.
Pull hose (3) off.
Take clamps (2) off hose.
6.
GO TO FRAME 2
TA 101584

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.