Click here to make tpub.com your Home Page

Page Title: Load Transfer Procedures (Sets connected for parallel operation)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-663-13&P
On operating generator set (generator 1), set UNIT-PARALLEL switch (16, figure 2-9) to
c.
PARALLEL.
Start generator set 2. Adjust voltage and frequency to match generator set 1.
d.
At switch box, set generator set 2 ON-OFF switch (3 or 6) to ON (Switch box STATUS and ON
e.
LINE lights for both generator sets should be lit).
At generator set 2 control panel:
f.
(1) Set UNIT-PARALLEL Switch (16) to PARALLEL. Both SYNCHRONIZING LIGHTS (12))
should be going bright to dark together.
CAUTION
If synchronizing lights on generator set 2 do not go bright and dark in
unison, the phasing is wrong. Shut down generator sets and check that
load cables are connected properly. Failure to observe this caution can
result in damage to generator sets.
( 2 Increase frequency until SYNCHRONIZING LIGHTS (12) blink together one or more times per
second.
(3) Decrease frequency until SYNCHRONIZING LIGHTS (12) blink together once every 3-4
seconds.
(4) While both synchronizing lights are dark, position and hold AC CIRCUIT INTERRUPTER
switch of generator set 2 in- the CLOSED position until indicator lights. SYNCHRONIZING
LIGHTS should go out (both generators are now operating in parallel).
Once both of the generator sets are on line and supplying power to the load in parallel, perform
g.
the following steps to transfer the load.
(1) At the control panel of the generator set that is to be taken off line (generator set 1), set the
AC CIRCUIT INTERRUPTER switch to the OPEN position. Set UNIT-PARALLEL switch to
UNIT, MASTER SWITCH to OFF.
(2) At the control panel of the running generator set (generator set 2), place the UNIT-PARALLEL
switch to UNIT. The load has now been transferred.
Perform the generator PMCS listed as DURING for generator set 2 and AFTER for generator set
h.
1.
2-40

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business