|
|
TM 9-2320-391-10
M1078A1 SERIES PREVENTIVE MAINTENANCE
0087 00
CHECKS AND SERVICES (PMCS) - Continued
Table 5. Preventive Maintenance Checks and Services (PMCS) - Monthly -
All Models - Continued.
ITEM
INTERVAL
MAN-
ITEM
CREWMEMBER
EQUIPMENT
NO.
HOUR
TO BE
PROCEDURE
NOT READY/
CHECKED
AVAILABLE IF:
OR
SERVICED
8
Monthly
Front Lifting
4. Lubricate top,
Beams -
bottom, and sides of
Continued
front lifting beam
(14).
5. Push front lifting
beam (14) back into
place.
6. Install two
retaining pins (13)
on front lifting beam
(14).
TYPE OF FLUID USED AT THESE EXPECTED
TEMPERATURES
Above 40F
40 to -15F
-15 to -50F
DESCRIPTION
CAPACITY
(Above 4C)
(4 to -26C)
(-26 to -46C)
Front Lifting
As required
GAA
GAA
GAA
Beam
0087 00-99
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |