|
|
TM 9-2330-391-10
LIGHT MATERIAL HANDLING CRANE (LMHC)
0021 00
OPERATION - Continued
STOW LMHC - Continued
14. Adjust boom (11) so that end of boom is in line with cargo bed tiedown ring (35).
15. Position hoist control switch (33) to CABLE DOWN and lower cable (32).
0021 00-29
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |