|
|
TM 9-2330-391-10
LIGHT MATERIAL HANDLING CRANE (LMHC)
0021 00
OPERATION - Continued
STOW LMHC - Continued
NOTE
Perform steps 6 through 9 if boom was extended.
6.
Remove quick release pin (43) from boom (11).
7.
Push in end of boom extension (44) so that boom (11) is fully retracted.
8.
Align hole in boom extension (44) with hole in boom (11).
9.
Install quick release pin (43) in boom (11).
0021 00-27
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |