|
|
TM 9-2330-391-10
LIGHT MATERIAL HANDLING CRANE (LMHC)
0021 00
OPERATION - Continued
TELESCOPE BOOM
NOTE
Steps 1 through 5 require the aid of an assistant.
Perform steps 1 through 5 if boom was in 25-degree or 57-degree position.
1.
Support end of boom (11).
2.
Remove quick release pin (12) from turret (13).
3.
Lower boom (11) to 0-degree position.
4.
Align holes in turret (13) and boom (11).
5.
Install quick release pin (12) in turret (13).
0021 00-20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |