|
|
TM 9-2330-391-10
LIGHT MATERIAL HANDLING CRANE (LMHC)
0021 00
OPERATION - Continued
PREPARE LMHC FOR USE - Continued
14. To lower cable (32) place hoist control switch (33) in CABLE OUT position.
15. Disconnect hook (34) from cargo bed tie-down ring (35).
0021 00-16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |