Click here to make tpub.com your Home Page

Page Title: CHANGING LMHC LOCATION - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-391-10
LIGHT MATERIAL HANDLING CRANE (LMHC)
0021 00
OPERATION - Continued
CHANGING LMHC LOCATION - Continued
19. Position turret (13) on mast (16).
20. Install quick release pin (15) in turret (13).
WARNING
Light Material Handling Crane (LMHC) boom and winch weighs
approximately 110 lbs (50 kg). The aid of an assistant is required to
install boom and winch. Failure to comply may result in injury to
personnel.
21. Position boom (11) on turret (13).
22. Install quick release pins (12) and (14) in turret (13).
0021 00-11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business