Click here to make tpub.com your Home Page

Page Title: CARGO BODY REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-2
0353 00
CARGO BODY REPLACEMENT (Contd)
AWARNINGA
All personnel must stand clear during lifting operations. A
swinging or shifting load may cause injury to personnel.
NOTE
Assistant will help guide cargo body during lifting operations.
13.
Remove cargo body (1) from frame rails (5) and place on wooden supports.
NOTE
Perform steps 14 and 15 if replacing cargo body.
14.
Remove cargo body tailgate (3) (TM 9-2320-361-20).
15.
Remove cargo body dropside (2) (M35A3C) (TM 9-2320-361-20).
16.
Remove frame sill (4) from each frame rail (5).
INSTALLATION
AWARNINGA
All personnel must stand clear during lifting operations. A
swinging or shifting load may cause injury to personnel.
NOTE
Use breaker bar to align body and frame brackets.
Assistant will help guide cargo body during lifting operations.
1.
Place frame sill (4) on each frame rail (5).
NOTE
Perform steps 2 and 3 if installing new cargo body.
2.
Install cargo body dropsides (2) (M35A3C) (TM 9-2320-361-20).
3.
Install cargo body tailgate (3) (TM 9-2320-361-20).
4.
Lift cargo body (1) off supports and lower onto frame rails (5).
0353 00-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business