Click here to make tpub.com your Home Page

Page Title: STE/ICE-R WIRING HARNESS REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-2
0331 00
STE/ICE-R WIRING HARNESS REPLACEMENT (Contd)
28.
Route STE/ICE-R wiring harness (14) and battery positive cable (17) through frame rail (9) and
grommet (10).
29.
Install slave receptacle cable (1), STE/ICE-R terminal with leads 770-E and 770-V (20), and positive
battery cable (17) on positive battery post clamp (19) with screw (21) and nut (18).
30.
Install STE/ICE-R terminal lead 770-X (8) on frame rail cable positive (+) side of shunt (24) with
washer (2), new lockwasher (5), and screw (7).
31.
Install two STE/ICE-R terminal leads with wires 770-Y (3) and 770-W and 770-F (4) on battery
cable negative (-) side of shunt (24) with washer (2), new lockwasher (5), and screw (6).
32.
Install two clamps (16) on STE/ICE-R wiring harness (14) and rear of battery box (23) with two
screws (15) and new locknuts (22).
33.
Install clamp (12) on STE/ICE-R wiring harness (14), slave receptacle cable (1), and frame rail (9)
with screw (13) and new locknut (11).
34.
Connect battery ground cable (WP 0121 00).
5
7
2
10
11
6
8
12
9
13
5
~
1
4
3
14
2
1
14
15
16
16
24
17
18
~
19
20
21
22
23
END OF WORK PACKAGE
0331 00-14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business