Click here to make tpub.com your Home Page

Page Title: FUEL INJECTOR SYNCHRONIZATION MAINTENANCE - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-2
0321 00
FUEL INJECTOR SYNCHRONIZATION MAINTENANCE (Contd)
NOTE
The spring pressure from the solenoid keeps all rack bar stop pins
against their injector bases in a "fuel-off" position if nothing is
hanging up or binding.
Double zero must be set with the rack bar stop pin of No. 1
injector against injector base ("fuel-off" position).
6.
Set double zero on horizontal dial indicator.
a. Loosen red thumb screw on side of holding fixture and slide horizontal dial indicator laterally
until small needle lines up on zero. Tighten red thumb screw.
b. Loosen bezel screw on horizontal dial indicator and turn bezel until large needle lines up on
zero. Tighten bezel screw.
NOTE
Ensure clamping screw is not protruding from threaded hole on
hook end of control linkage positioning tool. Any protrusion will
result in improper installation of control linkage positioning tool.
7.
Turn clamping screw on control linkage positioning tool until end of clamping screw is inside of
threaded hole.
8.
Turn limit screw on control linkage positioning tool until nylon spacer is seated against control
linkage positioning tool.
9.
Position control linkage positioning tool on control linkage shaft (2) between No. 4 (1) and No. 5 (3)
rocker arm supports.
CAUTION
Once installed, the control linkage positioning tool must not be
removed, loosened, or allowed to slip on the control linkage shaft
during the synchronization process. If the control linkage
positioning tool does not stay clamped in this position, the
synchronization process must be restarted.
NOTE
Ensure limit screw seats against cylinder head while tightening
clamping screw.
10.
Install control linkage positioning tool on control linkage shaft (2) by pressing down on limit screw
while tightening clamping screw until it grips control linkage shaft (2) securely.
NOTE
Rotating control linkage shaft toward push rod side of engine will
move all rack bars toward the "fuel-off" position and help free any
rack bars which may be hanging up or binding.
Ensure control linkage positioning tool moves freely and does not
touch rocker arm supports.
If the control linkage positioning tool does not stay clamped in
position, the synchronization process must be restarted.
Ensure limit screw seats against cylinder head when control
linkage positioning tool is released.
11.
Move control linkage positioning tool toward push rod side of engine to rotate control linkage
shaft (2), then release.
12.
Double check double zero on horizontal dial indicator.
a. If large needle on horizontal dial indicator does not move when control linkage positioning tool is
moved, then rack bar is in position and double zero is accurate.
b. If large needle on horizontal dial indicator does move when control linkage positioning tool is
moved, pull and release control linkage positioning tool several times until large indicator needle
becomes stable and rack bar no longer hangs up. Repeat steps 6, 11, and 12 to reset double zero.
0321 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business