Click here to make tpub.com your Home Page

Page Title: ENGINE AND CONTAINER REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-2
0296 00
ENGINE AND CONTAINER REPLACEMENT (Contd)
INSTALLATION
1.
Install two rear mounts (4) on engine (1) with eight new lockwashers (2) and screws (3).
2.
Install chain and lifting device on two lifting brackets (5).
WARNING
All personnel must stand clear during lifting operations. A
swinging or shifting load may cause injury to personnel.
Lifting device must have a weight capacity greater than 4,500 lbs
(2043 kg). Failure to do so may cause injury to personnel and/or
damage to equipment.
NOTE
Assistant will help with steps 3 through 5.
3.
Raise engine (1) from support stands.
4.
Position engine (1) over cradle (10) in lower container section (9) and align holes in cradle (10) with
holes in front mount (14) and two rear mounts (4).
5.
Lower engine (1) onto cradle (10).
6.
Install washers (13) and (12) and screw (11) on cradle (10) and front mount (14).
7.
Install four screws (8), new lockwashers (7), and nuts (6) on two rear mounts (4) and cradle (10).
8.
Position new gasket (17) on lower container section (9).
WARNING
All personnel must stand clear during lifting operations. A
swinging or shifting load may cause injury to personnel.
9.
Install chain and lifting device on upper container section (16).
10.
Install upper container section (16) on lower container section (9) with twenty-four washers (20),
screws (15), new lockwashers (19), and nuts (18).
0296 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business