|
|
TM 9-2320-386-24-1-2
0295 00
POWER PLANT REPLACEMENT (Contd)
54.
Connect wiring harness leads 74A and 74B (6) to transmission neutral safety switch leads (5) and
install on bracket (2) with clamp (1), screw (3), and new locknut (4).
55.
Connect lead 40 (31) to transmission shift lever lead (10).
56.
Install new lockwasher (19), ground lead 99A (18), screw (17), and new plain-assembled nut (9) on
transmission lever (12).
NOTE
Steps 57 through 61 only apply to vehicles with winch.
57.
Install hose (24) on elbow (13) with sleeve (29) and nut (26).
58.
Install hose (25) on elbow (30) with sleeve (28) and nut (27).
59.
Connect hose (22) to fitting (20).
60.
Connect hose (23) to tee (21).
61.
Install switch (14) on tower (11) with new lockwasher (15) and nut (16).
62.
Install two covers (8) on tower (11) with twelve screws (7).
1
4
3
2
6
5
0295 00-32
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |