|
|
TM 9-2320-386-24-1-2
0295 00
POWER PLANT REPLACEMENT (Contd)
46.
Install rear cab tunnel (6) on cab floor (8) with eight new assembled-washer bolts (7).
47.
Install toeboard (1) on cab floor (8) with eight new assembled-washer bolts (2).
48.
Install intermediate cab tunnel (5) on cab floor (8) with thirteen new lockwashers (3) and screws (4).
49.
Install toeboard insulation (13) on toeboard (1) with adhesive.
50.
Install rear cab tunnel insulation (12) and intermediate cab tunnel insulation (11) on cab tunnels (6)
and (5) with two retention straps (9) and ten screws (10).
51.
Install shift bracket (19) on transmission (18) with two new lockwashers (20) and screws (21).
52.
Install manual control lever (16) on shaft (17) with washer (15) and nut (14).
53.
Install new packing retainer (25) and modulator (22) on transmission (18) with clamp (24) and
screw (23).
2
3
4
4
20
1
3
5
6
4
3
7
~
8
0295 00-30
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |