|
|
TM 9-2320-386-24-1-2
0295 00
POWER PLANT REPLACEMENT (Contd)
18.
Install fuel inlet hose (9) on elbow (8) on fuel pump (7) and tighten nut (11).
19.
Install fuel outlet hose (10) on elbow (1) on fuel pump (7) and tighten nut (12).
20.
Install fuel outlet hose (10) and fuel inlet hose (9) on bracket (6) with two clamps (3), screw (2),
washer (4), and new locknut (5).
21.
Connect STE/ICE-R connector lead (30) to fuel pressure sender leads (29).
22.
Connect oil pressure sender lead 36 (17) to engine oil pressure transducer (18).
23.
Install engine harness lead 54A (31) and STE/ICE-R harness lead 770-R (28) on fuel shutoff
solenoid (13) with new lockwasher (27) and nut (26).
24.
Install engine harness ground (GND) lead (14) on fuel shutoff solenoid (13) with new
lockwasher (15) and nut (16).
25.
Install ground (GND) lead (20), clamp (23) with STE/ICE-R wiring harnesses (21), and engine
wiring harness (22) on stud (19) with washer (24) and nut (25).
26.
Install throttle control cable (37) and accelerator cable (38) on fuel pump (42) with bracket (41), two
washers (39), and screws (40).
27.
Install control cable pivot (35) on bracket (33) with new cotter pin (32).
28.
Install accelerator cable (38) on ball joint (34) with collar (36).
29.
Install new lockwasher (45) and ground strap (46) on stud (43) at firewall (44) with nut (47).
3
4
2
5
1
12
~
11
10
9
6
8
7
0295 00-24
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |