|
|
TM 9-2320-386-24-1-2
0295 00
POWER PLANT REPLACEMENT (Contd)
45.
Remove twelve screws (1) and two covers (2) from tower (4).
46.
Remove plain-assembled nut (23), lockwasher (11), ground (GND) lead 49A (10), and screw (9) from
transmission shift lever (5). Discard plain-assembled nut (23) and lockwasher (11).
47.
Disconnect lead 40 (24) from transmission shift lever lead (3).
NOTE
Steps 48 through 52 apply to vehicles with winch only.
Tag hoses for installation.
48.
Remove nut (8), lockwasher (7), and switch (12) from tower (4) to access elbows (6) and (25). Discard
lockwasher (7).
49.
Disconnect hose (16) from tee (14).
50.
Disconnect hose (15) from fitting (13).
51.
Remove nut (19), sleeve (22), and hose (17) from elbow (6).
52.
Remove nut (20), sleeve (21), and hose (18) from elbow (25).
53.
Disconnect wiring harness leads 74A and 74B (31) from transmission neutral safety switch leads (30).
54.
Remove locknut (29), screw (28), clamp (26), and wiring harness leads (31) from bracket (27). Discard
locknut (29).
1
2
2
4
1
3
5
7
6
8
24
23
25
9
22
21
10
11
13
12
20
19
14
16
17
18
15
0295 00-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |