Click here to make tpub.com your Home Page

Page Title: AIR DRYER AND AIR DRYER HEATER MAINTENANCE - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-1
0281 00
AIR DRYER AND AIR DRYER HEATER MAINTENANCE (Contd)
AIR DRYER INSTALLATION
1.
Install mounting plate (5) and mounting bracket (6) on crossmember (3) with four washers (2),
screws (1), and nuts (4).
2.
Apply sealant to male threads of elbows (9), (13), and (16), adapters (10) and (12), and
bushings (11) and (15).
3.
Install bushing (15) on control port (17) of air dryer (7).
4.
Install elbow (16) on bushing (15).
5.
Install adapter (10) and elbow (9) on inlet port (8) of air dryer (7).
6.
Install bushing (11), adapter (12), and elbow (13) on outlet port (14) of air dryer (7).
7.
Position air dryer (7) on mounting bracket (6) and clamp (18) and install jamnut (32).
8.
Install new lockwasher (21) and screw (22) on mounting bracket (6) and air dryer (7). Tighten
screw (22) 20-35 lb-ft (27-47 Nm).
9.
Install clamp (25) with air dryer heater connector (29) on clamp (18) with new lockwasher (26) and
nut (27).
10.
Connect wire harness connector 27 (30) to air dryer heater connector (29).
11.
Install tube (20) on air dryer inlet port elbow (9) and tighten nut (19).
12.
Install tube (23) on air dryer outlet port elbow (13) and tighten nut (24).
13.
Install tube (28) on air dryer control port elbow (16) and tighten nut (31).
OPERATIONAL CHECK
Once the unit is installed, start engine, build up pressure to 100 psi, and shut off engine. Check for air
leaks at inlet and outlet of dryer. Correct any leakage problem. Restart engine and build up pressure to
compressor cutout pressure. At cutout pressure the dryer purge valve opens and immediately expels a
large volume of air, followed by a slow flow of air lasting approximately thirty seconds.
7
3
~
1
2
17
16
8
4
10
15
9
14
11
5
12
6
13
0281 00-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business