Click here to make tpub.com your Home Page

Page Title: AIR BRAKE CHECK VALVE, PRESSURE SWITCH, AND AIR LINE REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-1
0275 00
AIR BRAKE CHECK VALVE, PRESSURE SWITCH, AND AIR LINE REPLACEMENT (Contd)
INSTALLATION
1.
Apply adhesive to male threads of elbows (16), (33), (38), and (43), unions (12) and (24), and tee (35).
2.
Install air lines (7) and (27), with inserts (23) and (25), on union (24) and tighten nuts (22) and (26).
3.
Install air lines (9) and (15), with inserts (11) and (13), on union (12) and tighten nuts (10) and (14).
4.
Install elbow (16) on check valve (17).
5.
Install air line (20), with insert (18), on elbow (16) and tighten nut (19).
6.
Install elbow (33) on pressure switch (45).
7.
Install pressure switch (45) on crossmember (4) with two screws (34), washers (5), and new
locknuts (6).
8.
Install tee (35) on check valve (42).
9.
Install elbows (38) and (43) on check valve (42).
10.
Install check valve (42) on crossmember (4) with screw (41) and new locknut (39).
11.
Install air line (30), with insert (32), on elbow (33) and tighten nut (31).
12.
Install air lines (9), (30), (7), and (2), with inserts (36), (28), (40), and (44), on tee (35) and elbows (38)
and (43) and tighten nuts (37), (29), (8), and (3).
13.
Install four new tiedown straps (21) on air lines (30), (20), (9), (7), and (2).
14.
Connect two leads 75 (46) of air brake electrical harness (1) to pressure switch (45).
0275 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business