Click here to make tpub.com your Home Page

Page Title: DRAG LINK MAINTENANCE - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-1
0181 00
DRAG LINK MAINTENANCE (Contd)
12.
Install stone shield (2) on studs (4) with two nuts (1). Tighten nuts (1) 60-80 lb-ft (81-108 Nm).
13.
Install stone shield (2) on flange (3) with two new lockwashers (5) and screws (6). Tighten
screws (6) 81-104 lb-ft (110-141 Nm).
14.
Repeat steps 12 and 13 to install other two stone shields.
15.
Start engine (TM 9-2320-386-10) and allow air pressure to build up to normal operating pressure.
Check for air leaks and road test vehicle.
3
4
2
1
5
6
END OF WORK PACKAGE
0181 00-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business