Click here to make tpub.com your Home Page

Page Title: AIR RESERVOIR REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-1
0165 00
AIR RESERVOIR REPLACEMENT (Contd)
NOTE
For schematic representation of air line locations and routing,
refer to WP 0386 00.
REMOVAL
CAUTION
When disconnecting air lines and hoses, plug all openings to
prevent dirt from entering and causing damage to internal parts.
NOTE
Tag hoses and air reservoirs prior to removal for installation.
Note position of elbows for installation.
1.
Remove two locknuts (2), hook bolts (4), and brackets (1) and (5) from air reservoirs (3) and (13).
Discard locknuts (2).
2.
Loosen nut (18) and remove hose (19) from elbow (17).
3.
Loosen nut (15) and remove hose (14) from elbow (16).
4.
Loosen nut (9) and remove hose (10) from connector (6).
5.
Loosen nut (11) and remove hose (10) from tee (12).
6.
Loosen nut (8) and remove hose (7) from tee (12).
7.
Loosen nut (24) and remove hose (25) from elbow (23).
8.
Loosen nut (28) and remove hose (29) from reducer (27).
9.
Remove elbow (20) from connector (21).
10.
Loosen nut (31) and remove hose (30) from connector (32).
11.
Loosen nut (34) and remove hose (35) from connector (33).
CAUTION
When removing air reservoirs, ensure fittings and elbows do not
become damaged.
12.
Remove air reservoirs (3) and (13) from supports (22) and (26).
0165 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business