Click here to make tpub.com your Home Page

Page Title: CTIS CONTROLLER-TO-SIGNAL GENERATOR WIRING HARNESS REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-1
0128 00
CTIS CONTROLLER-TO-SIGNAL GENERATOR WIRING HARNESS REPLACEMENT (CONTD)
REMOVAL
NOTE
Route wiring harness back to nearest tiedown strap after each
disconnection.
Tag all leads for installation.
1.
Disconnect two leads 431 and 432 (1) from signal generator leads (2).
2.
Remove tiedown straps (3) as necessary. Discard tiedown straps (3).
3.
Disconnect lead 40 (5) from front wiring harness lead 40 (4).
4.
Disconnect two leads 27 (6) from accessory/battery switch location D (8) and lead 27 (7).
5.
Remove eight assembled-washer bolts (9) from toeboard (10). Discard assembled-washer bolts (9).
6.
Remove four screws (12) and lockwashers (13) from intermediate cab tunnel (11) to allow for
removal of controller-to-signal generator wiring harness (14). Discard lockwashers (13).
7.
Remove toeboard (10) from vehicle.
8.
Remove controller-to-signal generator wiring harness (14) from vehicle.
INSTALLATION
NOTE
Transfer tags from old wiring harness to new wiring harness prior
to installation.
1.
Position controller-to-signal generator wiring harness (14) in vehicle.
2.
Connect two leads 431 and 432 (1) to signal generator leads (2).
3.
Connect two leads 27 (6) to accessory/battery switch location D (8) and lead 27 (7).
4.
Connect lead 40 (5) to front wiring harness lead 40 (4).
5.
Install new tiedown straps (3), as necessary, to hold controller-to-signal generator wiring
harness (14) in position.
6.
Position toeboard (10) in vehicle and install on intermediate cab tunnel (11) with four new
lockwashers (13), screws (12), and eight new assembled-washer bolts (9).
7.
Install toeboard and tunnel insulation (WP 0201 00)
8.
Install ECU (WP 0283 00)
9.
Connect battery ground cable (WP 0121 00).
0128 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business