Click here to make tpub.com your Home Page

Page Title: NATO SLAVE RECEPTACLE REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-1
0120 00
NATO SLAVE RECEPTACLE REPLACEMENT (Contd)
REMOVAL
.WARNING.
Do not remove slave receptacle before disconnecting battery
ground cable. If energized battery cable contacts cab, a direct
short will result and may result in injury to personnel.
1.
Remove four nuts (7), screws (1), lockwashers (2), waterproof cap (30), mounting plate (3), and plate
insulator (4) from cab (28) and slave receptacle (8). Discard lockwashers (2) and plate insulator (4).
2.
Remove slave receptacle (8) and spacer (6) from spacer (5).
3.
Remove four locknuts (32), screws (31), and spacer (5) from cab (28). Discard locknuts (32).
4.
Remove nut (22), washer (21), and lead 49A (19) from terminal (20).
5.
Remove nut (14), lockwasher (15), screw (23), leads 93 (18) and 50A (26), and lockwasher (17) from
rail (16). Discard lockwashers (15) and (17).
6.
Remove locknut (24), screw (13), and clamp (25) from cab (28). Discard locknut (24).
7.
Remove screw (12), washer (11), lockwasher (10), clamp (9), and clamp (29) from cab (28). Discard
lockwasher (10).
8.
Remove leads 50A (26) and 49A (19) and two grommets (27) from cab (28).
INSTALLATION
1.
Route leads 50A (26) and 49A (19) through two grommets (27) on cab (28).
2.
Install clamps (9) and (29) and leads 50A (26) and 49A (19) on cab (28) with new lockwasher (10),
washer (11), and screw (12).
3.
Install clamp (25) and lead 49A (19) on cab (28) with screw (13) and new locknut (24).
4.
Install leads 93 (18) and 50A (26) on rail (16) with new lockwashers (15) and (17), screw (23), and
nut (14).
5.
Install lead 49A (19) on terminal (20) with washer (21) and nut (22).
6.
Install spacer (5) on cab (28) with four screws (31) and new locknuts (32).
7.
Position spacer (6) and slave receptacle (8) on spacer (5).
8.
Install new plate insulator (4), mounting plate (3), waterproof cap (30), and slave receptacle (8) on
cab (28) with four new lockwashers (2), screws (1), and nuts (7).
9.
Connect battery ground cable (WP 0121 00).
0120 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business