|
|
TM 9-2320-386-24-1-1
0094 00
INSTRUMENT CLUSTER MAINTENANCE (Contd)
INSTALLATION
1.
Connect lead 85A (3) to indicator lamp (30).
2.
Connect two leads 27 and 67 (10) to leads 27 and 67 (9).
3.
Connect lead 27 (5) to voltmeter (21).
4.
Connect lead 40 (8) and lead 40 (13) to panel lights (29) and (16).
5.
Connect lead 17 (14) to high beam indicator (17).
6.
Connect lead 27 (5) and lead 28 (19) to fuel gauge (20).
7.
Connect lead 36 (12) and lead 27 (5) to oil pressure gauge (15).
8.
Connect lead 33 (4) and lead 27 (5) to engine temperature gauge (2).
9.
Connect lead 27 (18) to lead 27 (5).
10.
Install screw (27), new lockwasher (25), ground (GND) terminals (24) and (23), and nut (22) on
instrument mounting panel (1).
11.
Apply sealant on male threads of air pressure gauge (28).
12.
Connect air line (26) to air pressure gauge (28).
13.
Connect speedometer driveshaft (11) to speedometer (6).
14.
Connect cannon plug (7) to tachometer (31).
15.
Position instrument mounting panel (1) to vehicular panel (32) and install by turning four
lockstuds (33) 1/4-turn to right.
16.
Connect battery ground cable (WP 0121 00).
17.
Start engine (TM 9-2320-386-10) and check gauges for proper operation.
18.
Check for air leaks at air pressure gauge.
0094 00-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |