|
|
TM 9-2320-386-24-1-1
0080 00
WATER PUMP REPLACEMENT (Contd)
NOTE
Vehicles may come equipped with a Leece-Neville or Prestolite
alternator. STE/ICE-R wiring harness leads are connected to negative
and positive posts on either alternator.
21.
Connect lead 568 (17) to Y-connector (16).
22.
Install STE/ICE-R harness lead 770-N (12) and positive lead 2 (11) on stud (13) with new
lockwasher (10) and nut (9). Tighten nut (9) 45-55 lb-in. (5.1-6.2 Nm).
NOTE
Perform steps 23 and 24 for Prestolite alternators only.
23.
Install plate (3) on alternator (14) with two new lockwashers (2) and screws (1). Tighten screws (1)
30-35 lb-in. (3.4-3.9 Nm).
24.
Install cover plate (7) on alternator (14) with two new assembled-washer screws (8).
NOTE
Perform step 25 for Leece-Neville alternators only.
25.
Fill cover plate (7) or alternator wiring area with sealing compound and install cover plate (7) on
alternator (14) with two new lockwashers (19) and screws (18). Tighten screws (18) 30-35 lb-in.
(3.4-3.9 Nm).
26.
Install ground (GND) lead (4) and STE/ICE-R harness lead 770-P (15) on alternator (14) with new
lockwasher (5) and screw (6). Tighten screw (6) 83-102 lb-in. (9.4-11.5 Nm).
27.
Using a breaker bar, rotate belt tensioner (24) counterclockwise.
28.
Install fan drivebelt (22) on fan pulley (21), crankshaft pulley (23), and alternator pulley (20).
29.
Release belt tensioner (24).
30.
Connect battery ground cable (WP 0121 00).
31.
Fill radiator to proper level (WP 0068 00).
7
6
5
8
4
1
2
9
10
3
11
12
13
14
16
15
17
PRESTOLITE
0080 00-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |