Click here to make tpub.com your Home Page

Page Title: QUICK-START TUBES REPLACEMENT (BUILT BEFORE SERIAL NO. 504924) - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-1
0056 00
QUICK-START TUBES REPLACEMENT (BUILT BEFORE SERIAL NO. 504924) (Contd)
.WARNING.
Ether is extremely flammable. Perform this procedure in a well-
ventilated area away from flames and sparks. Failure to do so
may result in injury to personnel.
REMOVAL
1.
Loosen two nuts (2) and remove tubes (1) with sleeves (3) from atomizers (4).
2.
Loosen two nuts (11) and remove tubes (1) with sleeves (12) from atomizer tee (13).
3.
Loosen two nuts (9) and remove tube (10) with sleeves (8) from atomizer tee (13) and elbow (7).
4.
Remove locknut (6), screw (15), clamp (14), and atomizer tee (13) from mounting bracket (5). Discard
locknut (6).
INSTALLATION
1.
Install tube (10) with sleeves (8) on atomizer tee (13) and elbow (7) and tighten nuts (9).
2.
Install two tubes (1) with sleeves (12) on atomizer tee (13) and tighten nuts (11).
3.
Install two tubes (1) with sleeves (3) on atomizers (4) and tighten nuts (2).
4.
Install atomizer tee (13) on mounting bracket (5) with clamp (14), screw (15), and new locknut (6).
0056 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business