|
|
TM 9-2320-361-24-2
0432 00
PERSONNEL HEATER BURNER MAINTENANCE (Contd)
INSTALLATION
1. Position new preformed packing (12), new O-ring (11), and burner (8) on heat exchanger (10) and
install with four clamp and hook bolts (1). Tighten nut-assembled lockwasher (2).
2.
Install new lockwasher (6) and ground strap (5) on heater housing (9) and hook bolt (1) with
screw (7), new nut-assembled lockwasher (3) and nut-assembled lockwasher (4).
3.
Install personnel heater fuel line and blower housing (WP 0430 00).
4.
Connect battery ground cable (WP 0126 00).
5.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
1
2
3
10
4
9
8
5
7
6
11
8
9
12
13
14
20
23
19
22
21
18
17
15
16
END OF WORK PACKAGE
0432 00-3/4 blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |